Service 04 — Dubai, UAE
Apps Development
Mobile applications for iOS and Android — from the first sketch to the store listing, and the releases that follow.
- Platforms
- iOS, Android, cross-platform
- Typical build
- 8–16 weeks
- Includes
- Store submission
What’s included
Everything below is handled in-house by the same team — there is no third party to chase and no gap for the work to fall into.
Scoping and wireframes
What the app must do in version one, and what can safely wait for version two.
Interface design
Screens designed to platform conventions, so the app feels native rather than like a website in a frame.
Development
Built cross-platform where that saves you money, natively where performance demands it.
Backend and integrations
APIs, databases, payments, notifications and whatever systems you already run on.
Testing
Real devices, real conditions — tested before your customers do it for you.
Store submission
App Store and Play Store listings, screenshots, descriptions and the review process handled.
Scope of work
How we work
The same four stages on every engagement, whatever the size of the project.
Brief
We sit down with the goal, the audience and the budget, and agree what success actually looks like before anything starts.
Build
The work is produced in-house and shown to you early, rather than revealed at the end when changes are expensive.
Launch
Everything ships as one set, so this piece speaks in the same voice as the rest of your brand.
Measure
Reporting from day one, so the next round of spend is decided by numbers rather than by opinion.
Questions
The things clients ask before they sign. Answered straight.
Do we need an app, or just a good mobile site?
Can you take over an existing app?
What happens after launch?
Other services
Most projects use more than one. Combining them is usually cheaper than buying them separately.
Start a project
Need apps development
in Dubai?
Send the brief, or just the rough idea. We’ll come back with what it takes, what it costs, and how long it runs.